Maximum Demand Indicating Controller for Industries
SYNOPSIS
In
electrical distribution system, to avoid
low voltage and low frequency, electricity board is
limiting the power flow to the user. This is due to excessive load.
requirement than generation. Every
end user has to limit his power consumption to avoid
total low voltage and frequency.
To
over come the above problem, the electricity board allots the
load limits to its consumers according to the load. One day is divided into 24,48 or 96 cycles of
each 60,30 ,15 minutes duration. With in the one cycle
(60,30,15 minutes) the consumer can go upto their limit. If any
of the consumer has exceeded the limit he has to pay the penalty amout for
exceeding the limit. The penalty will be
too heavy for the consumer.
So for the
user to know that he is operating within his limits he need to have an
equipment which continiously keeps track of the load consumed and trips the
load when the load is about to exceed the limit.
Using this
MDC we can know the Power drawn in each
cycle, Available power in each cycle, Load shut down facility, Demand time
indication facility, Maximum demand limit issued by the
Electricity Board and Audio-visual alert system when the load is about to
exceed the limit.
contact:
MEGATECH
NO7,KANNAN AVENUE 1ST CROSS STREET,
MUDICHUR ROAD,OLD PERUNGALATHUR,
TAMBARAM WEST-CHENNAI 63
(NEAR HERO SHOWROOM,ANNAI ARUL HOSPITAL)
TEL:044 22761990
WHATSAPP:98402 34766
MOBILE:81444 34766,9659246311
WEB;http://megatechdiplomaprojects.blogspot.in/
EMAIL: megatechallprojects@gmail.com
MEGATECH
NO7,KANNAN AVENUE 1ST CROSS STREET,
MUDICHUR ROAD,OLD PERUNGALATHUR,
TAMBARAM WEST-CHENNAI 63
(NEAR HERO SHOWROOM,ANNAI ARUL HOSPITAL)
TEL:044 22761990
WHATSAPP:98402 34766
MOBILE:81444 34766,9659246311
WEB;http://megatechdiplomaprojects.blogspot.in/
EMAIL: megatechallprojects@gmail.com
No comments:
Post a Comment