FINAL YEAR PROJECTS ENGINEERING STUDENTS

FINAL YEAR PROJECTS ENGINEERING STUDENTS
FINAL YEAR PROJECTS DEMONSTRATION

Monday, 20 June 2016

ELECTRICAL PROJECT ABSTRACT:Maximum Demand Indicating Controller for Industries



Maximum Demand Indicating Controller for Industries


SYNOPSIS


In   electrical  distribution  system,  to  avoid   low voltage  and low frequency, electricity board  is  limiting the  power flow to the user.  This is due to excessive  load. requirement  than generation.  Every  end user has to limit his power  consumption  to avoid  total  low voltage and  frequency.

To  over  come the above problem,  the electricity board allots the load limits to its consumers according to the load.  One day is divided into 24,48 or 96 cycles of each 60,30 ,15 minutes duration.  With  in the one cycle (60,30,15 minutes) the consumer can  go upto their limit.  If  any of the consumer has exceeded the limit he has to pay the penalty amout for exceeding the limit.  The penalty will be too heavy for the consumer.

So for the user to know that he is operating within his limits he need to have an equipment which continiously keeps track of the load consumed and trips the load when the load is about to exceed the limit.


Using this MDC we can know the  Power drawn in each cycle, Available power in each cycle, Load shut down facility, Demand time indication facility, Maximum  demand  limit issued by  the  Electricity Board and Audio-visual alert system when the load is about to exceed the limit.

 contact:
MEGATECH
NO7,KANNAN AVENUE 1ST CROSS STREET,
MUDICHUR ROAD,OLD PERUNGALATHUR,
TAMBARAM WEST-CHENNAI 63
(NEAR HERO SHOWROOM,ANNAI ARUL HOSPITAL)
TEL:044 22761990
WHATSAPP:98402 34766
MOBILE:81444 34766,9659246311
WEB;http://megatechdiplomaprojects.blogspot.in/
EMAIL: megatechallprojects@gmail.com





No comments:

Post a Comment